Gurara Dam, Hydroelectric and Irrigation Project

DIGHE, CENTRALI IDROELETTRICHE

#HYDROELECTRIC PLANTS
# DAMS
Overview progetto
Dighe, centrali idroelettriche

Nigeria

Lavori in corso

The project involves civil and ancillary works for the construction of the Gurara Dam, 52.5 m high and 3 km long at the crest with a reservoir of approximately 880 million m³ of water. Mixed construction in loose materials and rockfill with a clay core and filters. Spillway excavated in granite rock and partly coated in concrete.

The works include 1.16 km supply tunnel, intake tower, drainage tunnel and include mechanical and metalwork. The electric power station will have an installed capacity of 3 x 10 MW.

The following works will be an integral part of the project:

  • 110 km of 132 kV high-tension electrical lines;
  • Access roads for a total of approximately 50 km;
  • Pilot irrigation system: Approximately 200 hectares of irrigated areas.

 

MAIN TECHNICAL DATA:

Abuja water supply: 14m3/s with 75 km of piping

Concrete: 126,000 m3

Water flow regulated by the dam: 36 m3/s (power station and pumping stations for irrigation);

Rock excavations: 2,400,000 m3

Measured dam volume: 9,000,000 m3

-Gurara-Water-Transfer-to-Federal-Capital-Terri
Materiale informativo - Progetto Ponte sullo Stretto di Messina
(*) Informazioni obbligatorie
Questo sito è protetto da reCAPTCHA e si applicano la Privacy Policy e i Termini di servizio di Google.